Page 3 - Curriculum Visions Dynamic Book
P. 3
4–13
The first steps 6 From arrows to rockets 6 Controlling the projectile 8 The nature of launch vehicles 9 Launcher design 10 Propulsion systems 10 Engines and motors 11 How launcher engines and motors work 12
14–21
The rocket pioneers 14 Converting military launchers 18 Modern launchers 20
22–29
Sputnik 22 The American challenge 24 Explorer and Vanguard 24 Discoverer 26 Tiros 27 Telstar 28
30–37 Vostok 33
Mercury 34 38–51
Gemini 38 The Apollo project 43 To the Moon—carefully 47
52–57
Reaching distant planets 52 Early probes 53 From Pioneer to Cassini 54
The augmented target docking adapter (ATDA) as seen from the Gemini 9 spacecraft. The ATDA and Gemini 9 are 60 metres apart. Failure of the docking adapter protective cover on
the ATDA to fully separate prevented the docking of the two spacecraft. The ATDA was described by the Gemini 9 crew as an “angry alligator.”
3